WINWORKS One applies mixed integer programming technique for calculating the best possible work shift plan.
The following points can be achieved by using mixed integer
programming:
(1) Staff assignments that align with demand for service.
(2) Flexibility on the definition, addition, service demand
changes, and work hour shift rules.
The improvement of the work efficiency is attempted by calculating
the work shift plan that reflects demand alternations in the forecasting service.
In addition, an optional calculation to suppress work hour within regulated series,
and to reduce the ineffectiveness at working hours as much as possible can be delivered.
It is not only the service demand level that is necessary in the
service industry, specific rules should also be consider and applicable. In
addition to, fairness and the easiness features, security and safety are also important
aspects that must be a part of any solution.
In WINWORKS One, the rule actually considered and used on a particular
location or at corporate level can be almost defined in the system in the same form as it
is applied and used at the site.
The rules have two kinds of conditions:
"Necessary condition" that should be filled and
"Sufficient condition" that you should fill as much as possible, and
doesn't have limitation in the number that can be defined.
When the rule is prepared, the wizard form template is generated,
and the rule can be easily defined by Multi phase approach
One of the weak points of mixed integer programming is that requires
extensive computing time in order to calculate among vast shifts combination and
set assorted restrictions to produce the duty roster with the best work
efficiency.
WINWORKS One has a mechanism of shortening a variety of
calculation time, and calculates and delivers the best duty roster at a practicable
time.
Three kinds of main speed-up techniques of WINWORKS One exist as
follows.
(1) Model compression
(2) Model partitioning
(3) Optimization phase division
The Winworks generically calls these techniques, Multi Phased
Optimization.